In general, inspections are required at each phase of construction; e.g., footing, foundation, slab, rough wire, under floor, under ground, rough in, sewer and water lines, etc., specific to the work being performed.
Building Services Division
|
|
- drain tile
- framing
- insulation
|
- ceiling close-up
- blocking
|
[additional information on Building Inspections...]
...call 410.638.3366 to schedule an inspection or for more information.
Electrical Services Division
- rough wire
- under floor
- under ground
|
- ditch
- concealed
- service entrance
|
- sub-feeder
- pool bonding
- pool wiring
|
...call 410.638.3363 to schedule an inspection or for more information.
Plumbing Services Division
- under floor
- under ground
- rough-in
|
- sewer installation
- sewer and water lines
- natural gas
|
|
...call 410.638.3215 to schedule an inspection (mobile/manufactured homes and abandoned properties) or for more information.
Mechanical
|
|
- gas – natural/LP
- under floor
|
|
...call 410.638.3215 to schedule an inspection or for more information.
Manufactured Housing/Mobile Homes
- footing (before concrete is poured)
- electrical inspection (permitted by a master electrician)
- plumbing inspection (permitted by a master plumber)
- final (skirting and steps (handrails and guardrails, if needed) installed and area stabilized by seeding and mulching)
...to schedule a footing, final inspection, or for more information call 410.638.3385.
Rental Housing Code
Enforcement of the Rental Housing Code and its standards and requirements is the responsibility of the Harford County Housing Agency.
|