|
 |
| Department of Public Works |
| 212 South Bond Street, Bel Air, MD 21014 |
410.638.3285 / 410.879.2000 |
|
|
|
|
|
 |
FREQUENTLY ASKED QUESTIONS
| Q: |
What happens should a developer
fail to construct all or part of the sidewalks? |
| A: |
Developers are required to post a
performance bond to ensure that all required sidewalks will be constructed. In the event
the developer fails to construct all of the required sidewalks, the County can call the
bond to complete this construction. |
| Q: |
Why control sediment? |
| A: |
Sediment fills drainage channels along
roadways, restricts flows through culverts, and storm drain systems and fill navigable
waterways, requiring costly maintenance and or dredging activities. Sediment changes the
underwater environment by screening out sunlight which reaches the bottom, it may also
increase water temperatures by absorbing the sunlight and thus warming the waters.
Additionally, sediments blanket stream and lake bottoms and creates an environment which
is not conducive to bottom dwelling organisms and may cover many of these organisms eggs.
Many nutrients and chemicals may be attached to soil particles and are introduced into
streams and waterways when they are transported to streams. |
|
|
|
 |
|
|
|