Bel Air Meter Replacements |
$100,000.00
Bel Air, MarylandThis project will provide design and construction of the Del Haven and Buchall meters. Current meters are
undersized and in excess of 20 years old. |
|
Church Creek PS Replacement |
$3,230,000.00
Mitchell Drive, Perryman
This
project will replace of the existing 4.32 mgd sewer pump station with a new 10 mgd
station. Expanded capacity is required for the anticipated growth within the
drainage area of the 1986 land use plan. This project also includes a 24-inch sewer
replacement in Mitchell Lane as well as two (2) interconnections between the Church Creek
collector and Parallel Sewer along Route 40. Funds for this project are to be
provided by developer/builder surcharges currently in effect. |
| Infiltration/Inflow |
$300,000.00
Harford County Sewer Service Area
To rehabilitate the existing sewers with excessive infiltration
and inflow. Work involved shall be manhole
repair, sewer line grounding and line replacement. This
project also allows for the purchase of flow meters and equipment for monitoring purposes. This equipment is required to accurately measure
the sewage flow and determine the remaining capacity of the sewage system. |
|
Pump Station Improvements 01 |
$450,000.00
Harford County Sewer Service Area
This project shall provide for improvements to the existing County pump stations due to needed
upgrades in capacity, stand-by electrical requirements, major repairs, safety requirements
and site improvements to comply with all local and state regulations. |
|
Railroad - Edgewood Land Lease |
$250,000.00
Edgewood, Maryland
Approximately 2-1/2 miles of the Edgewood Interceptor lies within CSX Railroad right-of-way.The current lease will expire and the County
wishes to purchase an easement in perpetuity. |
|
Surge Facility
Modification |
$120,000.00
Forest Greens
This project will allow for the funding and construction of the modifications required to the
existing Bush Creek Surge Facility.As the
flow increases from the existing Bush Creek pumping station, the Surge tower must be
raised approximately 20 feet so as to accommodate the increased maximum liquid level from
the output of the pumping station. |
| Bynum Run Parallel |
$10,020,000.00
Bynum Run Drainage Area
This project will parallel the existing Bynum Run Interceptor from just south of I-95 and north
of Wheel Road near MacPhail, near where the Plumtree collector ties in. The interceptor is nearing capacity and requires
relief. The project shall be built out in
phases as determined in the preliminary engineering study. This project will impact the Operating Budget with estimated increased costs
of $10,000.00 per year for clearing easement areas. |
| Construction Unanticipated - Sewer 02 |
$150,000.00
Harford County Sewer System
The purpose of this project is to establish an account to provide resources for projects
associated with the relocation of sewer mains affected by the relocation of State Highways
within Harford County. Until decisions are made as to who will pay for these relocations, Harford County needs the flexibility to
react to these unanticipated requirements. |
| Lower Bynum Run |
$5,640,000.00
South of I-95 to Bush Creek Pumping Station
This project will allow for the funding and construction of a parallel to the existing Bynum
Run Interceptor, from the Bush Creek Pump Station to MH #20, located approximately 2,000
feet south of Route 7. This section will
require approximately 4,420 lf. of 36-inch sewer from south of Route 7 to the south side
of I-95. |
| Sewer Petition 02 |
$600,000.00
Harford County Sewer System
This is an umbrella account for sewer petition projects.
This account is used to finance existing communities which are currently on
private septic systems and wish to have public sewer. Capital Investment is recouped from the community which benefits from the
public facility through annual assessments, as provided for in the Harford County Code. |
 |
Aberdeen Interconnection Improvements |
$205,000.00
Route 40 in AberdeenIn
accordance with the Harford County City of Aberdeen Water Purchase Contract dated
05/27/95, four (4) interconnections were required to be upgraded and an automatic control
system installed. The City failed to perform
their required work and in accordance with Paragraph 4 of the Contract, the County will
perform the work and charge the city for all expenses related to the work. |
| Abingdon Maintenance Facility |
$1,785,000.00
Abingdon Maintenance Shop
This project will allow for the funding for the purchase of land, design and construction for a
new maintenance facility to be built for Water and Sewer personnel. The existing facility will be rehabitated and
converted to a full Highway Maintenance Facility. This
project is a companion to Highway Capital Project and is the outcome of a feasibility
study performed by URS Greiner in March 1999. |
| Abingdon Road Phase III |
$820,000.00
Abingdon Road
The purpose of this project is to parallel existing 20-inch main along Abingdon Road from
water treatment plant site to Peverly Run Road. This
project will consist of design and construction of approximately 2,700 linear feet of
30-inch water main, as required for additional transmission main capacity from the
Abingdon Water Treatment Plant. |
| Computer Equipment/Networks |
|
$95,338.00
No description |
|
Topographic Mapping (Water and Sewer) |
$600,000.00
220 South Main Street, Bel Air, Maryland
Update of Harford Countys Geographic Information System Planimetric/Topographic Database. Updated every ten (10) years to meet the needs of
the Countys Public Works, Planning & Zoning, Emergency Response Agencies and
others, the database includes acquisition of aerial photography, digital terrain modeling,
orthophotos and capture of planimetric/topographic features. |
| Red Pump Road Parallel |
$555,000.00
Marywood
This project is to provide for the design and construction of approximately 3,000 lf of 16-inch
water main parallel to the existing 8-inch main, from Meadow Road to south of Honeysuckle
Road. |
| Tank Painting 01 |
$300,000.00
Harford County Water System
This project provides the Department with the financial capacity to paint and repair existing
water tanks. Stepney and Otter Point are our
next two tanks which require repair and painting. All
tanks require periodic renovations including cleaning, sand-blasting, structural and
safety repairs, and repainting. This account
allows for such requirements. |
| Water Sewer Replacement 01 |
$7,500,000.00
Harford County Water System
This project will allow funding for replacement and emergency repairs of existing polybutylene
(PBU) services throughout the water service area. By
eliminating the PBU service, which has resulted in numerous and costly water line breaks,
annual operating expenses should significantly decrease. |
| Bel
Air Bypass Transmission Line |
$4,700,000.00
Boulton to Conowingo
This project shall include design and construction of approximately 16,400 lf. of 24-inch water
main from the end of the proposed 20-inch main along Boulton Road with Maryland Route 24
for approximately 3,500 lf., then along the Bel Air Bypass to Conowingo Road. Also included is 550 lf. of 24-inch water main
from the Bel Air Bypass to Bynum Road along Conowingo Road and 750 lf. of 24-inch water
main along Bynum Road to Bynum Road Water Tank. |
| Boulton
Road Water Main Phase II |
$445,000.00
Bel Air, Maryland
This project shall be used for the design and construction of approximately 1,850 lf. of
20-inch water main, from the end of the proposed 20-inch main along Tollgate Road to end
of proposed 24-inch and 20-inch mains along MD Route 24. |
| Construction Unanticipated - Water 02 |
$300,000.00
Harford County Water System
The purpose of this project is to establish an account to provide resources for projects
associated with the relocation of water mains affected by the relocation of state highways
within Harford County. Until decisions are
made as to who will pay for these relocations, Harford County needs the flexibility to
react to these unanticipated requirements. |
| Country
Walk Water Parallel |
$535,000.00
Tollgate Road through Country Walk
This project includes design and construction of approximately 3,600 lf. of 20-inch water main
which parallels the existing 12-inch main from Wheel Road to Bel Air South Parkway. |
| Willoughby Beach/Edgewood |
$500,000.00
Edgewood, Maryland
This project provides for the design and construction of 2,300 lf. of 16-inch water main along
Willoughby Beach Road, which will parallel the existing 12-inch water main from Sequoia
Drive to the existing 8-inch water main in Edgewood Road.
This project will also include approximately 1,200 lf. of 16-inch water main
along Edgewood Road, which will parallel the existing 8-inch in Edgewood Road between
Willoughby Beach and Trimble Road. |
| Fourth Zone Water Loop |
$180,000.00
Harford County Water System
This project consists of the design and construction of approximately 1,000 feet of 12-inch
water main between the Spenceola Farms II subdivision and the Tuchahoe Farms subdivision,
along Route 23. Construction of this project
will complete an eventual water main loop within the fourth zone of the water distribution
system. |
| Hickory
Industrial Park Tank |
$2,100,000.00
Hickory Ridge Industrial Park
This project shall provide for the design and construction of a 1 million gallon elevated
storage tank and approximately 700 linear feet of 16-inch feeder main. |
| Route 40 Stepney Parallel |
$550,000.00
Stepney Along Route 40
This project shall consist of design and construction of approximately 2,200 lf. of 16-inch
water main parallel to the existing 16-inch main in Route 40, from its intersection with
Route 7 to Stepney elevated tank. |
| Village of McLean Transmission Main |
$350,000.00
Village of McLean
This project will allow for funding for the increase size of the water main required to be
installed with the construction of Village of McLean Development. Approximately 3,900 lf. of 24-inch water main through the proposed
development of Village of McLean from Singer Road to the Country Walk Tank. It is anticipated that the developer will
proportionally share in the cost of the project, as required by the preliminary plan. |
| Water Petition 02 |
$500,000.00
Harford County Water System
This is an umbrella account for Water petition projects. This account is used to finance existing communities which are currently on
private wells and wish to have public water. Capital
Investment is recouped from the community which benefits from the public facility through
annual assessments, as provided for in the Harford County Code. |
| Water Zone Improvements 03 |
$300,000.00
Harford County Water System
This project will allow for the financial capacity to study, design and/or construction miscellaneous distribution, stations and treatment improvements as required
with the Harford County Water System. It will allow for booster station improvements and interconnections between developments as
our system continues to grow. |
|