Building Inspections
Please contact the Building Services Division at 410-638-3366 prior to 3 p.m. to schedule a next business day inspection. Requests received after 3 p.m. will be scheduled for the second business work day. Remember: Your building permit number is required to schedule an inspection.
If you wish to speak with your inspector, please call 410-638-3366 between 7-7:30 a.m. and 3:30-4 p.m.
Health Department and Water and Sewer approvals are required for all commercial permits. To check on the status of or to pickup a Use and Occupancy Certificate, please call 410-638-3366 or go to our ePermit Center.
If you wish to speak with your inspector, please call 410-638-3366 between 7-7:30 a.m. and 3:30-4 p.m.
Inspections
The code requires one copy of the approved plans and specifications together with the permit to be kept at the site of operation at all times during the progress of the work. It is the responsibility of the person obtaining the permit to notify the building official when work is ready for inspection and no work should be covered before it has been inspected and approved. Requests for inspection are required in accordance with the following schedule:- Footing: Prior to pouring concrete, after cleaning out and grade stakes in place, stone entrance (minimum of 10 feet wide by 25 feet long) installed and a silt-fence installed around the lowest perimeter of disturbance.
- Foundation: Prior to backfill, after parging and drain tile if outside. Not required on garage.
- Slab/drain tile: Prior to pouring slab and drain tile if inside. Not required on garage.
- Framing: Prior to application of insulation and after plumbing and electrical inspection.
- Insulation: Prior to application in interior finish.
- Final: Prior to occupancy (Type 1 - outside items only)
- Use and Occupancy Certificate (U&O): Required prior to occupancy.
Important Note:
Building permits are valid for twelve months from the date of issuance. "Any permit issued shall become invalid if the authorized work is not commenced and diligently pursued within twelve months after issuance or is suspended or abandoned for a period of six months after the work has commenced. Another permit, upon application, may be issued if the applicant can demonstrate that construction will commence within six months after reissuance and will be diligently pursued to completion." Diligently pursued is interpreted as, "An inspection obtained within six months from the date of the previous inspection."Use & Occupancy Certificate
A final Use and Occupancy Certificate is required and must be issued after completion of your project and prior to occupancy. A Use and Occupancy is required for all:- Commercial construction
- Residential construction
Scheduling Inspection
To schedule a required inspection, please call:Agency |
Phone |
---|---|
Building Services | 410-638-3366 |
Electrical Services | 410-638-3363 |
Health Department | 410-877-2300 (well and septic) |
Plumbing Services |
410-638-3215 (plumbing, mechanical and fuel gas) |
Water and Sewer, DPW | 410-612-1612 (public facilities) |
Health Department and Water and Sewer approvals are required for all commercial permits. To check on the status of or to pickup a Use and Occupancy Certificate, please call 410-638-3366 or go to our ePermit Center.