Church Creek Elementary School Restoration Project

Harford Streams
Green Choices. Healthy Streams.

Church Creek Elementary School Restoration Project 

Expected construction start: Early 2023

Harford County is undergoing a stream restoration and stormwater retrofit at this location. The purpose of the project is to improve stream health by stabilizing eroding stream banks, stabilizing failing stormdrains, and increasing tree buffers along the stream. Additionally, this project will improve water quality by converting an existing stormwater pond into a submerged gravel wetland. A submerged gravel wetland is an infiltration practice that is designed to treat stormwater runoff. The existing infiltration trench is proposed to be enlarged for stormwater treatment.

Pre-construction pictures 

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6

Project Location 

Church Creek Website map jpeg

Design (100%)