Fallston Library Stormwater Retrofit

Construction Start: Summer 2021, Expected Completion: Fall 2021

The purpose of this project is to improve water quality by converting an existing dry extended detention pond into a bioretention. A bioretention is an infiltration practice that is designed to treat stormwater runoff.

Pre-Construction Picture

PreCon Fallston Library

Construction Progress (11/2/2021)Fallston_

Final Construction Walk-Through (11/16/2021)

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

Project Design (Final)

Fallston Library Plans Opens in new window