The Laurel Valley Stream Restoration was constructed in 2009.
While the majority of the project is stable, there are isolated areas with displaced bank rocks and property loss. Project objectives include reducing erosion, preventing property loss, and providing long term stability. This is part of an adaptive management strategy that includes monitoring our projects and repairing them as needed.